ep

January 18, 2021

Standard Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this electrical power unit is developed for your operation of two independent circuits. Which are respectively for the key and subordinate platforms with the double scissors lift. Two cut-off valves are applied for reducing the machine manually in situation of energy loss. If a lot more independent circuits are required for the application please get in touch with us for availability.
Remark: one. Please check with our product sales engineer to the different pump displacement, motor energy or tank capacity.
two. CSA or UL licensed motors can be found on request.
Exclusive Notes
one. The AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean every one of the hydraulic elements concerned prior to set up of the power unit.
3. Viscosity with the oil shoud be 15~46 cst,as well as the oil really should be clean and free of charge of impurities,N46 hydraulic oil is advised.
four. The electrical power unit really should be mounted vertically.
five. Check the oil degree during the tank following the first running in the power unit.
6. Oil modifying is needed following the preliminary one hundred operation hrs,afterwards when every 3000 hours.

Leave a Reply

Your email address will not be published. Required fields are marked *